North Evoikos and Maliakos Gulf, Oreoi channel, Pagassitikos gulf, Thermaikos gulf, Ierrisos gulf, Kavala gulf, Kalloni and Gera gulfs of Lesvos Island. The project aims to the collection and analysis of fishing fleet data for the closed an sensitive gulfs: North Evoikos and Maliakos Gulf, Oreoi channel, Pagassitikos gulf, Thermaikos gulf, Ierrisos gulf, Kavala gulf, Kalloni and Gera gulfs of Lesvos Island in order to elaborate and enforce a fishing vessel decommissioning plan which will aid the application of the decommissioning goals for 2013 which were set in the Structural Plan for Fisheries 2007-2013 of the Ministry of Agricultural Development and Food.
Elaboration of a decommissioning plan for fishing vessels that operate within closed and sensitive gulfs
Share This Post
Projects supervised by: Dr A. Conides
-
VALUE
Duration: 16 monthsExploitation of the discards within the reformed CFP without the creation of income for the fishermen (VALUE). Study area: Aegean Sea. The study aims to analyse in detail the logistics of the …
-
Fishing gear ‘trawl’
Duration: 2014 (24 months)Technical Improvement of the fishing gear ‘trawl’ in order to enhance its use and achieve energy efficiency. The conclusions from several RTD projects conducted by the Institute for Marine Biological …
-
DRIFTMED
Duration: 2013-2014 (12 months)Identification and characterization of the small scale driftnets fisheries in Mediterranean.The DRIFTMED project was carried out under the umbrella of MAREA group of projects aiming to provide scientific advice to …
-
Research and Consulting Project on the Saudi Arabia Fisheries Sector
Duration: 2013-2015 (36 months)The Saudi Arabia project aimed to the offering of technical support to the Saudi Arabia fisheries sector in the Arabian Gulf, for development and conservation. The project was composed of 11 …
-
COFASP {FP7}
Duration: 48 monthsCooperation in Fisheries Aquaculture and Sea Food Processing. The project is an ERANET and is the follow-up of the eranet MARIFISH. The project builds on the experience of the eranets MARIFISH …
-
MY GEAR
Duration: 10 monthsTechnical specifications of Mediterranean trawl gears. The goal of the contract is to have updated information on the characteristics of trawl nets used in different Mediterranean fisheries, with a view to …
-
ARCHIMEDES
Duration: 9 monthsEstimation of maximum net length of trammel nets, gillnets and combined bottom set nets by using the volume or the mass of the net. The project objective is to create an …
-
ARCH
Duration: 2011-2014 (36 months)Architecture and roadmap to manage multiple pressures on lagoons. The project aims to the study and management of coastal marine aquatic ecosystems, such as coastal wetlands. The contribution of IMBRIW is …
-
SMPE
Duration: 4 monthsContribution in the elaboration of the Strategic Study of Environmental Impact of aquaculture within the frame of the National Cadastral Design and Sustainable Development plan for aquaculture. Based on the …
-
PEGASO
Duration: 47 monthsPeople for Ecosystem Based Govermnance in Assessing Sustainable Development of Ocean and Coast (PEGASO)aims to build on existing capacities and to develop common novel approaches to support integrated policies for …