Project services from the Asprofos SA, entitled ‘Monitoring and Evaluation of Water Quality in the catchment area of Geropotamos, Florina‘.
ACHLADA (Geropotamos Stream Study)
Share This Post
Projects supervised by: Dr Elias Dimitriou
-
FLOODS-TECH
Duration: 2023 (18 months)Water monitoring with state-of-the-art technologies for the management of anthropogenic and natural disasters The purpose of the project is to install a network of automatic water quality and quantity monitoring stations …
-
PRESPA RIVERS
Duration: 2022 (16 months)Assessment for the ecological role, functioning and biodiversity values of rivers/streams that flow in Prespa Lakes The project concerns the monitoring on a monthly and/or seasonal basis of physicochemical and hydromorphological …
-
EVROTAS-STATIONS
Duration: 2022 (30 months)Installation and operation of a network of automatic water monitoring stations in the Evrotas river basin The project concerns the installation and operation of automatic water monitoring stations in Evrotas river. HCMR …
-
EASTMED
Duration: 7 monthsSpecial Ecological Assessment at the cross sections of East-Med gas pipeline and river water systems. Asprofos SA For the needs of the Environmental Impact Study of the EAST MED Pipeline Project, …
-
TRIKALA-STATIONS
Duration: 6 monthsEstablishment of an automatic monitoring network for flood warnings in Trikala Municipality. Ex Machina The project concerns the installation and operation of automatic water monitoring stations in rivers of the Municipality …
-
ISOTOPES GR
Duration: 24 monthsMonitoring of the National Network of Isotopes in Rivers in Greece. International Atomic Energy Agency-UN Identifying the dominant water pollution sources and their relative contribution to the quality status of surface …
-
MENALON IoT
Duration: 17 monthsEnvironmental monitoring actions in water bodies and hiking trails in mountainous Arcadia with the use of innovative technologies The project aims to apply innovative technologies in the monitoring of surface waters …
-
JRC KARLA
Duration: 8 monthsLandscape elements for water retention in a Mediterranean Environment – The Lake Karla case (LWRM KARLA). The project deals with the overall assessment of the restoration project of Lake Karla in …
-
OHRID LAKE WATERSHED
Duration: 7 monthsSurveillance monitoring program for the Ohrid Lake Watershed The project deals with the sampling and analysis of biological quality elements, surface water and sediment in rivers, to assess the ecological, chemical …
-
Open ELIoT
Duration: 28 monthsThe aim of the project is the implementation of an integrated and economically viable Internet of Things solution for monitoring and analyzing environmental parameters with regard to surface water. The solution extends from sensors …