During the summer of July 2006 significant biological degradation in Koumoundourou Lake was observed with the massive death of the lake’s fishes. The HCMR attained immediately water and sediment sampling and analysis to identify the reason for the particular ecological destruction.
Water quality and sediment measurements in Koumoundourou Lake
Share This Post
Projects supervised by: Dr E. Dimitriou
-
Pikrodafni Stream
Duration: 6 monthsAssessment of the Ecological Status of Pikrodafni stream. The project concerns the ecological assessment of Pikrodafni stream, in order to quantify its status and the dominant pollution threats. Based on the …
-
Development of an integrated management system for river basin, coastal and marine zones (KRIPIS)
Duration: 25 monthsThe ultimate aim of the project is to study the changes that occur in a watershed, under a holistic approach, by including in a unified research scheme the terrestrial and …
-
Environmental flows downstream of dams (ECOFLOW)
Duration: 30 monthsThe project ECOFLOW aims to create a systematic and standardized procedure for assessing ecologically acceptable flows in rivers and streams whose flow regime is impacted by water resource development. The flow …
-
Assessment of the Ecological Status of Pikrodafni Stream
Duration: 4 monthsThe project concerns the environmental monitoring of Pikrodafni stream, in order to quantify its ecological quality status and the dominant threats. A representative sampling network will be developed in which monthly …
-
Trans Adriatic Pipeline
Duration: 7 monthsThe project is a part of the Environmental Impact Assessment study for the construction of the Transadriatic Pipeline (TAP) and concerns the assessment of the ecological quality of water and …
-
Μonitoring of ecological water quality of Koumoundourou Lake and designing management
Duration: 17 monthsThe project concerns the environmental monitoring of Lake Koumoundourou, in order to quantify its ecological quality status and the dominant threats. A representative sampling network will be developed in which monthly …
-
Assessment of the environmental status of Evros river catchment. Pressures mapping and analysis
Duration: 10 monthsThe project includes the assessment of the environmental status of Evros river catchment and the essential next steps for the sustainable environmental management and preservation of the area. The project will …
-
Environmental monitoring in N. Plastiras reservoir
Duration: 25 monthsThe project includes the environmental monitoring of N. Plastiras reservoir according to the Water Framework Directive (WFD) provisions for the ecological quality assessments. A representative sampling network will be developed …
-
Preliminary assessment of the impacts of an Aeolian park construction in Ag. Dynati (Kefalonia)
Duration: 2008-2009 (2 months)The project constitutes a preliminary investigation for the impacts of an Aeolian park in Ag. Dynati, Kefalonia, on the Flood risk of the respective catchment. Initially, the current geomorphologic conditions …
-
ECODOM
Duration: 47 monthsAdvancing understanding of carbon cycling and coloured dissolved organic matter dynamics in European wetlands & coastal ecosystems through integration of observations and novel modelling approaches. This proposal aims at facilitating an …